- Internal Links Page
- Antonis & Manolis Bekatoros
- Argos
- Atakoy Marina
- Bakalaris
- Bolts
- Burning
- Caulking
- Central Deckhouse and Mast
- Central Deckhouse
- Choice of Colors
- Construction of the New Gunwale
- Construction of the Deckhouses
- Docking Blocks
- Eight Tree Trunks
- Emmanuel V. Riginos
- False Keel
- “Faneromeni’s” Engine Compatrment
- “Faneromeni's” Instruments
- “Faneromeni’s” Naval Construction Plans
- Fanouris Vasileiou
- First Phase of “Faneromeni’s” Reconstruction…
- Francis Type 2000 Two Speed
- Friends and the Dogs
- George Mytilhnaios
- Greek Vernacular Boatbuilding
- Halkitis Shipyard
- Homeric Cultural Center of the Municipality of Chios
- Ilias Veloudis
- Installation of Balast and a False Keel
- Installation of the Ballast
- Installation of the Onan AC Generator
- Interior Arrangements
- Kanakis
- Keel Change
- Kelvin
- Kokinos Vraxos
- Kostas A. Damianidis
- Koupetoris Shipyard
- Major Overhaul of the Kelvin Engine
- Mastheads
- Mastro
- Modification of the Stern Deckhouse (Pilothouse)
- Name Choice
- Naxos
- Nikitas Prasinos
- Nikos E. Riginos
- Notis Bilias
- Odysseas, a ship from Ithaca, 1837-1841
- Pachos Papastefanou
- Patriarch Bartholomew
- Perama
- Peter Throckmorton
- Recessed Technique
- Reconstruction of the Ribs
- Re-installation, after the overhaul, of the boat’s Kelvin engine and…
- Removal of the Old Bridge
- Removal of the Old Gunwale
- Re-Nailing
- Replacement of the Gunwale
- Replacement of the Keel
- Rolando Rapues Jr.
- Samiopoula
- Schooner
- Several Places in Greece
- Strati Afaloniati
- Stratis Afaloniatis Lumber Yard
- Submerging the Tree Trunks in the Sea
- Thanasis Dritsoulas
- Τhe Sea Remembers
- Tigraki (Little Tiger)
- Transporting the Tree Trunks from Lesvos
- Trunks are Transported to Mastro-Pachos’ Workshop
- Vasilis E. Riginos
- Vasilis Vallas
- Vasilis Zairopoulos
- Viron E. Riginos
- Yiannis Kakouris
- Yiannis Vlassopoulos
Re-Nailing
New nails are added to the planking in order to re-enforce their adhesion to the ribs. This adhesion could have been weakened by the oxidation of the old nails. The new nails are punched in deep into the wood and then are covered with putty.